by
Kenneth Allen / Raphoe Town
Raphoe Regeneration Masterplan, Donegal
Heritage-Led Regeneration Strategy & Action Plan, an initiative commissioned by Donegal County Council to guide the revitalisation of Raphoe town centre, in County Donegal, Ireland
Anchored in the principles of the national Town Centre First policy, this project seeks to develop a comprehensive and forward-looking strategy that places heritage, placemaking, and community engagement at the heart of local regeneration. Through a multidisciplinary, conservation architect-led team, the project will craft a roadmap to guide Raphoe’s sustainable transformation—enhancing its image, infrastructure, and vibrancy while celebrating its rich cultural and built heritage. The Strategy & Action Plan will integrate stakeholder consultation, urban design, environmental stewardship, and economic development to generate a practical, actionable framework for renewal. The outcome will serve as a key instrument to attract investment, support local enterprise, and foster a more liveable and resilient town for current and future generations.
Location
Sector
Conservation / Culture / Urbanism
Intervention
Regeneration Strategy
Website
Tender Stage
One Stage Tender
Deadline
19 May 2025
Project Value/Scale
Est €50-60,000 fee
Consultant Team
Grade 2 Conservation Architect (Project Lead)
Archaeologist
Architect / Landscape Architect / Urban Designer
Planner
Engineer
Ecologist
Quantity Surveyor
CGI Technical Artist
Graphic Designer
Communications/Community Engagement Specialist
Project Supervisor Design Process (PSDP)
Archaeologist
Architect / Landscape Architect / Urban Designer
Planner
Engineer
Ecologist
Quantity Surveyor
CGI Technical Artist
Graphic Designer
Communications/Community Engagement Specialist
Project Supervisor Design Process (PSDP)
Submission Criteria
This one-stage open tender is scored 60% quality, 40% price.
ITT Pass/Fail Criteria:
– Declarations of compliance with legal, tax, and employment obligations
– Confirmation of SME status (if applicable)
– Tax compliance confirmation
– Annual turnover ≥ €100,000 for each of the last 3 years
– Employer’s Liability: €13 million
– Public Liability: €6.5 million
– Product Liability: €6.5 million
– Professional Indemnity: €1 million
– At least 3 relevant previous contracts (past 5 years) showing experience with similar scale, scope, and complexity
– Health & Safety compliance (e.g., Safety Statement, relevant policies)
– Access to necessary technical tools and software (e.g., CAD, GIS, Adobe Suite)
Quality Questions:
– Methodology & Understanding of Brief – 25% weighting (2,500 points max)
– Project Programme – 10% weighting (1,000 points max)
– Team Quality & Expertise – 25% weighting (2,500 points max)
Price:
– 40% weighting (4,000 points max)
– Lowest compliant cost receives full marks
– Other bids scored using a formula: (Lowest Cost ÷ Tenderer’s Cost) × 4,000