by
© Limehouse, Bartlett Park by Mike Faherty, CC BY-SA 2.0 , via Wikimedia Commons
Bartlett Park Extra Care Facility
London Borough of Tower Hamlets is seeking to procure an architectural design consultant to develop a design for housing for extra care on the land adjacent to Bartlett Park.
Tower Hamlets aims to create a number of extra care bed places within the borough to the benefit of its existing residents and families, and to reduce the ongoing financial burden of out of borough placements, which is unsustainable in the long term. In addition, Tower Hamlets has one of the most ethnically diverse populations in Britain, home to many communities including the largest Bangladeshi community in the country, accounting for 34.6% of the overall population in the Borough.
The site at Augusta Street, adjacent to Bartlett Park, has been identified as providing a Culturally Sensitive Extra Care Housing development and potentially some general needs housing.
The design team are asked to explore and present a range of options that make best use of the underdeveloped land for housing with Extra Care and to increase the supply for general needs affordable housing, which includes:
- Preparing a hybrid planning application to comprise a) an outline approval (RIBA stage 2) for the entire scheme and b) a detailed planning application (RIBA Stage 3) for the extra care housing development.
- Subject to pre-app discussions, a detailed application (RIBA Stage 3) for the entire site to include Extra Care housing and general needs housing.
Location
Sector
Residential
Website
Tender Portal
Tender Stage
ITT
Deadline
28 February 2025
Project Value/Scale
£250k
Consultant Team
Architect
Submission Criteria
Assessed 50% on Quality, 10% on Social Value and 40% on Price.
Pass/Fail:
– Potential Supplier Information, Bidding Model
– Exclusion Declarations
– Minimum Turnover of £500k
– Health and Safety Statement
– £ PII
Quality Assessment
– Project Team and Capability Statement
– Relevant Experience
– Design Approach
– Sustainability and Future Proofing
– Site Utilisation