par
Universitätsklinikum Bonn, CC BY-SA 4.0, via Wikimedia Commons
Consultation BIM pour la nouvelle clinique centrale de Bonn
L'Universitätsklinikum Bonn AöR développe la deuxième phase de sa nouvelle clinique centrale à Bonn, en Allemagne, et recherche des services de conseil BIM pour la conception et la construction du centre opératoire. Date limite : 22 sept. 2026
The Universitätsklinikum Bonn AöR is undertaking the second construction phase of its new central clinic, which involves replacing the existing Operative Centre (Building B 22). This new central building will house operative departments, a central operating theatre, intensive care, general nursing, outpatient clinics, and radiology facilities. The planned new build will be developed in conjunction with the new Heart Centre (Building B 25), which forms the first phase of the Central Clinic, and will be erected on the site of the current Medical Clinic (Building B 26) after its demolition. The entire construction project will utilise the Building Information Modelling (BIM) planning method, with specific requirements and services integrated into the planning disciplines. The client previously engaged BIM consultants to define BIM objectives and parameters for the planner tenders and project preparation. This tender seeks further BIM consulting services, covering design phases 3 (approval-ready planning), 5 (implementation planning and tender preparation), and 8 (construction supervision and handover of building information for operation).
Secteur
Santé
Site web
Portail des appels d'offres
Date limite
22 sep 2026
Date d'ajout
9 septembre 2026
Valeur estimée
0 à 5 M£