Single-stage open tender for technical design and author’s supervision of TU Sofia Plovdiv’s new sports hall and facilities campus site, in Bulgaria.
The Technical University of Sofia has launched a public tender for the detailed technical design and construction-stage author’s supervision of a new Sports Complex at its Plovdiv Branch campus, located at 63 Saint Petersburg Boulevard in the Gladno Pole district of Plovdiv. The project will transform a designated university plot (PI 56784.529.118) into a contemporary multi-functional sports environment serving more than 2,500 students. Conceived as an integrated campus facility, the development comprises a Sports Hall and Adjacent Sports Facilities, designed to address the current shortage of athletic infrastructure while establishing a distinctive architectural presence within the urban setting. The brief calls for a durable, energy-conscious and contextually responsive building that integrates carefully with the surrounding campus fabric and landscape.
The Sports Hall will accommodate a minimum 1,000 m² playing field with adaptable configuration, spectator seating for at least 280 people including accessible positions, a fitness hall of no less than 350 m², and associated ancillary spaces such as changing rooms, technical areas and reception facilities. Externally, the scheme includes football and tennis courts, landscaped areas and a small café pavilion. The appointed design team will develop the client’s existing outline architectural concept into a full Technical Design package across all disciplines, including architecture, structure, building services (electrical, plumbing and drainage, heating, ventilation and air conditioning), energy performance, fire safety strategy, landscape design and a detailed Bill of Quantities, followed by author’s supervision throughout construction until completion.
Standort
Sektor
Education, Sport Leisure
Intervention
Neubau
Webseite
Ausschreibungsportal
Ausschreibungsphase
einstufige Ausschreibung
Frist
2. Apr. 2026
Hinzugefügt am
27 Februar 2026
Geschätzter Wert
0,5 Millionen
Beraterteam
Architekt
Bauingenieur
Engineering geology (site investigation/report)
Electrical engineer (incl. power/low current; lighting; systems)
Water supply & drainage (WSS / plumbing & drainage)
HVAC + gasification
Energy efficiency
Geodesy (setting-out + vertical planning)
Landscape + external works (park/amenity + hardscape)
Fire safety (incl. evacuation schemes)
Health & Safety plan (construction H&S)
Construction waste management plan
Costing / BoQ / Project cost documentation
Equipment & furnishings / interior design (as a project part)
Bauingenieur
Engineering geology (site investigation/report)
Electrical engineer (incl. power/low current; lighting; systems)
Water supply & drainage (WSS / plumbing & drainage)
HVAC + gasification
Energy efficiency
Geodesy (setting-out + vertical planning)
Landscape + external works (park/amenity + hardscape)
Fire safety (incl. evacuation schemes)
Health & Safety plan (construction H&S)
Construction waste management plan
Costing / BoQ / Project cost documentation
Equipment & furnishings / interior design (as a project part)
Einreichungskriterien
Einzureichende Ergebnisse:
– Ausgefüllte Einheitliche Europäische Eigenerklärung (EEE)
– Consortium agreement (if applicable)
– Subcontractor declarations (if applicable)
– 3rd-Party capacity commitment (if applicable)
– Declaration of confidential information (if applicable)
– Arbeitsanweisung
– Proposed project team
– Finanzangebot
– Price breakdown