von
Małopolska Psychiatry Centre, Kraków
A specialist children's hospital in Kraków, Poland, is constructing a new centre for psychiatry and digital addiction treatment. Deadline 25 Sep 2026
The Wojewódzki Specjalistyczny Szpital Dziecięcy im. św. Ludwika w Krakowie is initiating a design and build contract for the Małopolska Centre for Psychiatry and Treatment of Digital New Technologies Addiction. Located on Strzelecka street in Kraków, the project sits within the historic urban layout of the Wesoła area, necessitating careful consideration of formal, conservation, organisational, logistical, and communication aspects, especially when conducting construction work within a compact urban setting. The comprehensive programme is divided into two phases. The first phase, lasting 12 months, focuses on developing complete design documentation, including architectural, structural, sanitary, electrical, and road engineering designs, as well as obtaining all necessary permits and approvals. The second phase, which will run for a maximum of 30 months from the contract date but no later than March 31, 2029, involves the full execution of construction works, site development, utility connections, supply and installation of equipment, and any preparatory, temporary, demolition, and restoration tasks required to deliver a fully operational facility.
Sektor
Gesundheitswesen
Intervention
Neubau
Webseite
Ausschreibungsportal
Frist
25 Sep 2026
Hinzugefügt am
20 September 2026
Geschätzter Wert
5 bis 15 Mio. £