通过
Michielverbeek, CC BY-SA 3.0, via Wikimedia Commons
Dümpelfeld污水处理厂综合楼
德国阿德瑙联合镇(Verbandsgemeinde Adenau)正在邓佩尔费尔德(Dümpelfeld)重建并扩建其中央污水处理厂,包括新建一座运营大楼(遭遇洪水灾害后)。截止日期:2026年9月28日
The Verbandsgemeinde Adenau is undertaking a significant project to rebuild, modify, and expand its central wastewater treatment plant, "Adenauer Bach," located in Dümpelfeld, Germany. This initiative follows the devastating Ahr Valley flood in July 2021, which severely damaged critical infrastructure at the plant, including the operating building, transformer station, control room, emergency power generator, and blower stations. The expansion is crucial as the plant will now also process wastewater from the neighbouring Altenahr municipality, whose facilities were completely destroyed and are not being rebuilt. The upgraded plant will increase its capacity to approximately 27,000 population equivalents. The project aims to achieve an energetically and economically optimised, climate-neutral operation, incorporating artificial intelligence for process optimisation and enhanced energy efficiency. Planning for the project is intended to utilise Building Information Modelling (BIM). This specific tender focuses on architectural services, covering design phases 1-9, for the new operating building, including the interior design of the laboratory and control room, and developing a comprehensive facade concept for all high-rise structures within the plant.
部门
Infrastructure, Retrofit Refurbishment
网站
招标门户
截止日期
2026年9月28日
添加日期
1 9 月 2026
估计值
0至500万英镑