por
Trougnouf (Benoit Brummer), CC BY 4.0, via Wikimedia Commons
Urban Park Regeneration, Dison
Appointment of a multidisciplinary design team to complete and deliver a permitted urban park regeneration project in central Dison, Belgium.
The Commune of Dison has launched the regeneration of a 6,050 m² brownfield site in the heart of the town, formerly occupied by economic activities, to create a new landscaped urban park that reconnects the lower town along Rue Albert 1er with the upper slopes and surrounding neighbourhoods. Conceived as a civic landscape infrastructure project, the scheme introduces a sequence of terraces responding to the site’s topography, forming a public park structured around a central square, multi-generational play and sports areas, terraced orchards, community allotments, informal lawns, and planted buffer zones. An urban lift establishes an accessible vertical link between the lower and upper levels of the town, complemented by pedestrian routes, ramps suitable for cycles and pushchairs, new stair connections, and integrated car and cycle parking. Sustainable drainage strategies are embedded within the landscape through infiltration zones and planted depressions, reinforcing biodiversity and improving environmental performance.
Planning permission has already been developed to permit stage, and the appointed multidisciplinary design team will assume the project at detailed design stage, preparing the works tender documentation and delivering full construction supervision through to final completion. The commission includes demolition of existing structures, site remediation works, coordination of structural and infrastructure elements (including highways and drainage), delivery of the urban lift, and the integration of health and safety coordination throughout both design and construction phases. Operating within a fixed construction budget of €4,025,000 (excluding VAT) and supported by regional funding programmes, the project positions landscape as both a social catalyst and a connective urban device, redefining the civic identity of Dison’s town centre while strengthening links between its upper and lower quarters.
Localização
Setor
Infraestruturas, Espaço Público Paisagístico, Masterplanning Urbano
Intervenção
Remodelação
Sítio Web
Portal de Concursos
Fase de Concurso
Concurso público por uma só fase
Prazo-limite
16 Mar 2026
Data de Adição
26 Fevereiro 2026
Valor estimado
0,5 milhões
Equipa de Consultores
Arquiteto
Structural Engineer (including structures and highways/infrastructure)
Health & Safety Coordinator
Structural Engineer (including structures and highways/infrastructure)
Health & Safety Coordinator
Critérios de Submissão
Entregáveis da Submissão:
– Completed ESPD (DUME) form
– Offer form
– Signed declarations
– Proof of registration with the Order of Architects
– Declaration of average annual turnover (last 3 years) – minimum requirement: € 200k average annual turnover
– CV e qualificações do pessoal-chave
– Designation of a Project Leader
– Formal commitments from any subcontractors
Technical & Professional Capacity:
– Two similar references within the last 10 years
– Each minimum € 500k construction value (excl. VAT)
– At least one must be a public contract
– Max. 1 A4 double-sided page per reference
– Include: project name, client, value, dates, surface area, brief description, photo