par
Roger Cornfoot / English Heritage - National Monuments record centre
Swindon Archive Decarbonisation, Swindon
Historic England is advancing its net-zero goals by overhauling environmental systems and upgrading fabric at its Swindon national archive facility, UK. Deadline 04 Nov 2026
Historic England is seeking a multidisciplinary design team to lead the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3, with a potential extension to Stage 4. The project forms a critical part of Historic England’s commitment to achieving net-zero carbon emissions by 2040. The purpose-built archive, constructed in 1993 to BS5454 standards, houses nationally important photographic, film, and documentary collections, but its existing mechanical and electrical systems are ageing, energy-inefficient, and are not aligned with net-zero objectives. Recent equipment failures have underscored the increasing risk to collection preservation, building resilience, and operational continuity. A completed RIBA Stage 2 feasibility study explored options to reduce operational carbon, improve energy performance, and secure the archive’s long-term sustainability. The preferred solution involves replacing existing end-of-life environmental control systems with more energy-efficient solutions, rationalising environmental zones, enhancing thermal performance and airtightness through fabric improvements, implementing fire safety upgrades, and creating additional archive storage capacity by repurposing existing plant room space.
Secteur
Heritage Conservation, Retrofit Refurbishment
Intervention
["refurbishment"]
Site web
Portail des appels d'offres
Date limite
04 nov. 2026
Date d'ajout
11 octobre 2026
Valeur estimée
0 à 5 M£