par
Jerry Dougherty, CC BY 2.5, via Wikimedia Commons
Tyrrell School Roof & RTU Replacement, Wolcott
The Wolcott Board of Education in the USA is commissioning professional design services for a comprehensive roof and rooftop unit replacement project at Tyrrell Middle School in Wolcott, Connecticut. Deadline 28 Aug 2026
The Wolcott Board of Education is seeking professional design services for the Tyrrell Middle School Roof and Roof Top Units Replacement project. The existing roof, approximately 93,532 square feet, comprises sections of 32-year-old BUR and 25-year-old EPDM, both of which have reached the end of their serviceable life, exhibiting numerous deficiencies and ponding areas due to compressed insulation. Concurrently, 28 existing rooftop units at the school require replacement, having also reached the end of their useful life. The project involves a complete tear-off of the existing roof down to the structural decking, installation of new tapered insulation, a new roof system with a 20-year warranty, and new metal flashings. Partial roof deck replacement and hazardous materials abatement for flashings and adhesives may also be required. The scope includes the replacement of existing rooftop units and associated mechanical, electrical, and plumbing connections, with the design team also responsible for evaluating existing roof pitches, structural capacity, drainage systems, and roof penetrations.
Secteur
Education, Retrofit Refurbishment
Portail des appels d'offres
Date limite
28 Aug 2026
Date d'ajout
19 août 2026
Valeur estimée
0 à 5 M£