par
New Kindergarten & Clubrooms, Weinheim
Germany's City of Weinheim plans a new-build kindergarten and clubrooms for IG Waid, replacing an existing facility with significant structural issues. Deadline 16 Nov 2026
The City of Weinheim in Germany is commissioning the replacement new-build of the Kita Waid kindergarten on Hammerweg 7, following the identification of significant structural defects in the current building, which was originally a school. The project encompasses the construction of a two-group kindergarten alongside dedicated clubroom facilities for IG Waid. Located on a 1,750 m² plot at the eastern edge of an existing residential area, the site presents topographical challenges with a slight westward slope and a notable 3-metre height difference in the north-western section. Ground conditions are complex, necessitating deep piling foundations for the new structure. The preferred design solution, developed from a feasibility study, envisions a single-storey building with a gross floor area of approximately 1,000 m². It features a rectangular form with strategic cut-outs to create a pavilion-like appearance, prioritising the preservation and integration of the mature trees on the site. Key design objectives include investigating conventional and modular construction methods, aiming for Passive House standards with a future-oriented Plus-energy balance, incorporating regenerative energy supply, and considering the CO2 footprint and ecological criteria. The architectural services, covering HOAI phases 1-9, will be commissioned in two stages, with planning commencing in May 2027 and construction projected to start in the third quarter of 2028. An interim solution for the kindergarten during construction is planned but falls outside the scope of this tender.
Secteur
Communauté civique, Éducation
Intervention
Nouvelle construction
Site web
Portail des appels d'offres
Date limite
16 nov. 2026
Date d'ajout
28 octobre 2026
Valeur estimée
0 à 5 M£