par
New 2-group Kindergarten, Weinheim
The City of Weinheim in Germany is initiating a replacement new build for the Kita Waid kindergarten, creating a modern two-group facility with additional club rooms for IG Waid. Deadline 16 Nov 2026
The City of Weinheim is seeking architectural services for the replacement new build of the Kita Waid kindergarten on Hammerweg 7 in Weinheim, Germany. The existing building, originally a school, suffers from significant structural defects, necessitating its demolition and replacement. The project involves constructing a two-group kindergarten along with dedicated premises for the IG Waid club, on a 1,750 m² plot located at the eastern edge of a residential area. Site conditions include a gentle slope and a 3-metre height difference in the northwest, which must be considered for building arrangement, accessibility, and drainage. Crucially, challenging ground conditions require a deep foundation using pile systems. The preferred design is a single-storey building covering almost 1,000 m² gross floor area, with a pavilion-like structure that integrates and preserves the existing mature trees. Key design goals include exploring conventional and modular construction methods, aiming for passive house standards and a future-oriented plus-energy balance, utilising renewable energy sources, and considering the CO² footprint and ecological criteria. The budget for construction costs (cost groups 300 and 400) is approximately €4.088 million gross. The project will be phased, with initial planning (stages 1-3) followed by detailed design and construction oversight (stages 4-9).
Secteur
Communauté civique, Éducation
Intervention
Nouvelle construction
Site web
Portail des appels d'offres
Date limite
16 nov. 2026
Date d'ajout
3 novembre 2026
Valeur estimée
0 à 5 M£