بواسطة
Lijsterweg IKC New Build, Sliedrecht
Sliedrecht Municipality in the Netherlands commissions an integrated design team to develop the new Lijsterweg Integrated Child Centre. Deadline 18 Nov 2026
The Municipality of Sliedrecht is procuring an integrated design team for the construction of a new Integrated Child Centre (IKC) on Lijsterweg. The project will proceed via a European competitive dialogue procedure, structured in two main phases. Initially, a selection phase will identify a single architect. Following this, the selected architect will be responsible for assembling a comprehensive design team, incorporating all necessary design and advisory disciplines. This integrated team will then participate in the dialogue and bidding phase, ultimately submitting a final proposal for the IKC Lijsterweg development. The project aims to create a modern educational and care facility, serving the community's needs through a holistic approach to child development and learning within a purpose-built environment in Sliedrecht, Netherlands. The process emphasises collaborative design to ensure a well-rounded and functional outcome.
قطاع
المجتمع المدني، التعليم
تدخل
بناء جديد
موقع إلكتروني
بوابة المناقصات
الموعد النهائي
18 Nov 2026
تاريخ الإضافة
28 أكتوبر 2026
القيمة التقديرية
5 إلى 15 مليون جنيه إسترليني