{"id":65234,"date":"2026-08-31T21:19:27","date_gmt":"2026-08-31T21:19:27","guid":{"rendered":"https:\/\/beedier.com\/tenders\/power-infrastructure-for-port-polska-western-warsaw-2\/"},"modified":"2026-08-31T21:19:27","modified_gmt":"2026-08-31T21:19:27","slug":"infraestrutura-de-energia-para-port-polska-western-warsaw-2","status":"publish","type":"tenders","link":"https:\/\/beedier.com\/pt\/tenders\/power-infrastructure-for-port-polska-western-warsaw-2\/","title":{"rendered":"Infraestrutura Energ\u00e9tica para o Port Polska, Oeste de Vars\u00f3via"},"content":{"rendered":"","protected":false},"template":"","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","footnotes":""},"tender-categories":[],"class_list":["post-65234","tenders","type-tenders","status-publish","entry"],"acf":{"image":65232,"banner":65231,"banner_caption":"New Port Polska, via ulysse.com","index_intro":"Centralny Port Komunikacyjny is developing essential power infrastructure for the Port Polska investment in Poland, encompassing substations and 110 kV cable lines. Deadline 04 Sep 2026","region":"europe","country":"poland","sector":["infrastructure","retail-logistics-industrial"],"type":"qualification-for-competition","value":"fifty-million-plus","website":"https:\/\/ted.europa.eu\/en\/notice\/-\/detail\/592040-2026","tender_portal":"https:\/\/portpolska.ezamawiajacy.pl\/pn\/cpk\/demand\/302490\/notice\/public\/details","deadline":"04 Sep 2026","tender_source":"ted-europa-eu","content":"<p>The project focuses on constructing critical power supply infrastructure for the \"Port Polska\" investment in Poland. This extensive undertaking includes the development of several key components: RPZ (110 kV\/15 kV) substation buildings, a GPO-C (110 kV\/15 kV) station building, generator station buildings, and 110 kV cable lines designed to connect the Port Polska investment to the national power grid. The overall scope is meticulously divided into seven distinct tasks, all of which will be executed under a single comprehensive contract. These tasks encompass civil works and essential design efforts for connections to both PGE and PSE stations, alongside the establishment of multiple Rozdzielczy Punkt Zasilaj\u0105cy (RPZ) substations\u2014specifically RPZ-1, RPZ-2, RPZ-3, and RPZ-4\u2014each integrated with SCADA systems, as well as the GPO-C station. The investment is strategically located within Poland's Mazowieckie Voivodeship, spanning the Grodzisk, \u017byrard\u00f3w, and Sochaczew counties, and encompassing the Baran\u00f3w, Wiskitki, and Teresin communes. Centralny Port Komunikacyjny anticipates securing co-financing for parts of the project from European Union funds and various third-party financial entities.<\/p>","calendar_date":"20260904","intro":"<p>Centralny Port Komunikacyjny is developing essential power infrastructure for the Port Polska investment in Poland, encompassing substations and 110 kV cable lines. Deadline 04 Sep 2026<\/p>\n"},"_links":{"self":[{"href":"https:\/\/beedier.com\/pt\/wp-json\/wp\/v2\/tenders\/65234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/beedier.com\/pt\/wp-json\/wp\/v2\/tenders"}],"about":[{"href":"https:\/\/beedier.com\/pt\/wp-json\/wp\/v2\/types\/tenders"}],"version-history":[{"count":0,"href":"https:\/\/beedier.com\/pt\/wp-json\/wp\/v2\/tenders\/65234\/revisions"}],"wp:attachment":[{"href":"https:\/\/beedier.com\/pt\/wp-json\/wp\/v2\/media?parent=65234"}],"wp:term":[{"taxonomy":"tender-categories","embeddable":true,"href":"https:\/\/beedier.com\/pt\/wp-json\/wp\/v2\/tender-categories?post=65234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}