{"id":81832,"date":"2026-11-07T23:31:50","date_gmt":"2026-11-07T23:31:50","guid":{"rendered":"https:\/\/beedier.com\/tenders\/new-2-group-kindergarten-weinheim\/"},"modified":"2026-11-07T23:31:50","modified_gmt":"2026-11-07T23:31:50","slug":"new-2-group-kindergarten-weinheim","status":"publish","type":"tenders","link":"https:\/\/beedier.com\/es\/tenders\/new-2-group-kindergarten-weinheim\/","title":{"rendered":"New 2-group Kindergarten, Weinheim"},"content":{"rendered":"","protected":false},"template":"","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","footnotes":""},"tender-categories":[],"class_list":["post-81832","tenders","type-tenders","status-publish","entry"],"acf":{"date_added":"20261103","banner_caption":"","index_intro":"The City of Weinheim in Germany is initiating a replacement new build for the Kita Waid kindergarten, creating a modern two-group facility with additional club rooms for IG Waid. Deadline 16 Nov 2026","region":"europe","country":"germany","sector":["civic-community","education"],"type":"two-stage-tender-pqq","value":"zero-to-five-million","intervention":["new-build"],"website":"https:\/\/ted.europa.eu\/en\/notice\/-\/detail\/762434-2026","tender_portal":"https:\/\/www.subreport.de\/E35462654","deadline":"16 Nov 2026","tender_source":"ted-europa-eu","content":"<p>The City of Weinheim is seeking architectural services for the replacement new build of the Kita Waid kindergarten on Hammerweg 7 in Weinheim, Germany. The existing building, originally a school, suffers from significant structural defects, necessitating its demolition and replacement. The project involves constructing a two-group kindergarten along with dedicated premises for the IG Waid club, on a 1,750 m\u00b2 plot located at the eastern edge of a residential area. Site conditions include a gentle slope and a 3-metre height difference in the northwest, which must be considered for building arrangement, accessibility, and drainage. Crucially, challenging ground conditions require a deep foundation using pile systems. The preferred design is a single-storey building covering almost 1,000 m\u00b2 gross floor area, with a pavilion-like structure that integrates and preserves the existing mature trees. Key design goals include exploring conventional and modular construction methods, aiming for passive house standards and a future-oriented plus-energy balance, utilising renewable energy sources, and considering the CO\u00b2 footprint and ecological criteria. The budget for construction costs (cost groups 300 and 400) is approximately \u20ac4.088 million gross. The project will be phased, with initial planning (stages 1-3) followed by detailed design and construction oversight (stages 4-9).<\/p>","calendar_date":"20261116","intro":"<p>The City of Weinheim in Germany is initiating a replacement new build for the Kita Waid kindergarten, creating a modern two-group facility with additional club rooms for IG Waid. Deadline 16 Nov 2026<\/p>\n"},"_links":{"self":[{"href":"https:\/\/beedier.com\/es\/wp-json\/wp\/v2\/tenders\/81832","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/beedier.com\/es\/wp-json\/wp\/v2\/tenders"}],"about":[{"href":"https:\/\/beedier.com\/es\/wp-json\/wp\/v2\/types\/tenders"}],"version-history":[{"count":0,"href":"https:\/\/beedier.com\/es\/wp-json\/wp\/v2\/tenders\/81832\/revisions"}],"wp:attachment":[{"href":"https:\/\/beedier.com\/es\/wp-json\/wp\/v2\/media?parent=81832"}],"wp:term":[{"taxonomy":"tender-categories","embeddable":true,"href":"https:\/\/beedier.com\/es\/wp-json\/wp\/v2\/tender-categories?post=81832"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}