von
© Cranbrook : Younghayes Road by Lewis Clarke, CC BY-SA 2.0 , via Wikimedia Commons
Cranbrook Leisure Centre
East Devon District Council seeks a multidisciplinary team to deliver a new leisure centre as part of the Cranbrook Wellbeing Campus.
Cranbrook Leisure forms part of a broader health and wellbeing campus in the emerging town of Cranbrook, East Devon. Designed to serve a forecast population of 18,000 residents, the leisure centre is co-located with the future Neighbourhood Health Centre and other community facilities. The centre will include a six-lane 25m pool, learner pool with moveable floor, large gym, fitness studios, shared changing, and a multi-use social area. The project will be developed up to RIBA Stage 3 with an expected transition to a Design and Build contract. The design must reflect environmental performance aspirations (BREEAM Excellent), community integration, and Sport England compliance. Key planning and business case approvals align to the delivery programme from 2025–2028.
Standort
Sektor
Sport und Freizeit
Intervention
New Leisure Centre
Ausschreibungsportal
Ausschreibungsphase
ITT
Frist
15 October 2025
Hinzugefügt am
23 September 2025
Geschätzter Wert
£30m estimate
Beraterteam
Architect (Lead Designer)
Landschaftsarchitekt
Bauingenieur
MdEP
Fire Consultant
Highways / Transport Consultant
BREEAM Assessor
Cost Consultant
Chefdesigner (CDM)
Building Regulations Principal Designer
Clerk of Works / NEC Supervisor
Project Manager / Contract Administrator
Business Case Consultant
Marketing & Comms
Specialist surveyors (Ecology, Archaeology, Noise, Arboriculture, etc.)
Landschaftsarchitekt
Bauingenieur
MdEP
Fire Consultant
Highways / Transport Consultant
BREEAM Assessor
Cost Consultant
Chefdesigner (CDM)
Building Regulations Principal Designer
Clerk of Works / NEC Supervisor
Project Manager / Contract Administrator
Business Case Consultant
Marketing & Comms
Specialist surveyors (Ecology, Archaeology, Noise, Arboriculture, etc.)
Einreichungskriterien
Assessed 60% on quality and 40% on price.
Section A – People & Team (CV-based)
A1: Team Organogram
A2–A6: CVs for Lead Designer, Project Architect, Structural, Mechanical, and Electrical Engineers
Section B – Technical Approach
B1: Swimming Pool Design Experience
B2: Understanding of Sport England Guidance
B3: Experience Delivering Similar Projects on Budget & Time
+ Pricing document and certificates