by
ASBP Awards 2025
Award submissions are assessed against the ‘Six Pillars of Sustainable Construction’: Health & Wellbeing, Resource Efficiency, Whole-Life Carbon, Ethic and Transparency, Technical Performance, Social Value.
Finalists announcement on 4000+ mailing list, 9000+ social media contacts, 15+ partner organization and media partner future build (60,000+ mailing list).
Finalists invited to present at ASBP Awards ceremony.
Finalists showcased at Futurebuild 2024 (Excel London, 5-7 March)
Website
Eligibility
Project Category
- Project must have completed by September 2023.
- Must be located within the United Kingdom.
- May be new build or retrofit
- Entries are welcomes from any person in the project team (i.e. architect, consultant, client, contractor, product manufacturer/supplier).
- Joint submissions from more than one company / person in the project team are welcomed.
- Companies located outside of the United Kingdom may apply, as long as the project is situated within the UK.
- Shortlisted entrants may be required to record a short video to supplement their application.
- Shortlisted projects will be required to host an in-person site visit during November-December 2023.
- Project must have completed by September 2023.
- Must be located within the United Kingdom.
- May be new build or retrofit
- Entries are welcomes from any person in the project team (i.e. architect, consultant, client, contractor, product manufacturer/supplier).
- Joint submissions from more than one company / person in the project team are welcomed.
- Companies located outside of the United Kingdom may apply, as long as the project is situated within the UK.
- Shortlisted entrants may be required to record a short video to supplement their application.
- Shortlisted projects will be required to host an in-person site visit during November-December 2023.
Submission
Entries to be submitted using the submission template which includes:
- Project Summary (100 words approx..) + Main Image
- Key information: Project name, address, location, building completion date, building size (sqm), construction cost (approx..), Construction type (i.e. masonry/timber frame), building use (i.e. residential).
- Project Team: Architect/Designer, Client, Contractor, Consultants, Product Manufacturers/Suppliers.
- Framed answers within aspirations of the ASBP’S ‘Six Pillars of Sustainable Construction’: 1) Health and Wellbeing 2) Resource Efficiency 3) Whole-life Carbon 4) Ethic and Transparency 5) Technical Performance 6) Social Value
- Project Summary (100 words approx..) + Main Image
- Key information: Project name, address, location, building completion date, building size (sqm), construction cost (approx..), Construction type (i.e. masonry/timber frame), building use (i.e. residential).
- Project Team: Architect/Designer, Client, Contractor, Consultants, Product Manufacturers/Suppliers.
- Framed answers within aspirations of the ASBP’S ‘Six Pillars of Sustainable Construction’: 1) Health and Wellbeing 2) Resource Efficiency 3) Whole-life Carbon 4) Ethic and Transparency 5) Technical Performance 6) Social Value
Entry cost
Free
Entry deadline
16th October 2023